Streetscape Design for Eagle & State
Project Description
Cost-sharing with the City of Eagle for the cost of a consultant to prepare and complete the design of streetscape and sidewalk improvements along State Street from Olde Park to 2nd Street and on Eagle Road from Plaza Drive to Idaho Street. The project includes design of sidewalk, street trees, silva cells, landscaping, irrigation, conduit, electrical, and street lights.
Public Documents
2019
Task Order 19-03 State Eagle Signed
Original MOA between City and EURA signed